Project Engineering and Management (2181704)  

List of Practicals

Sr. Practical Title
1
Study of standards and symbols (ANSI / ISA Std.)
2
Study of specification sheets
3
Development of Process & Instrument diagram of typical process.
4
Development of Loop Wiring diagram
5
Cable scheduling.
6
GA and mimic diagram of a control panel
7
Development of Bar charts for certain project
8
Prepare the cost estimation sheet for the project under consideration
9
Hands on experience for engineering management software such as MS Project, Primavera, etc.
10
Designing of control valve for liquid/gas/vapor applications as per standard
11
Design of orifice plates for liquid/gas/vapor as per ISO 5167
12
Operating range calculation for transmitters considering different applications

Open Ended Problem
Consider a typical manufacturing process. For that start from estimation to commissioning stage of instrumentation system, prepare detail report comprising of sample design calculations, justification for selection of instruments and systems, work flow diagram and manpower estimation, necessary engineering diagrams, test and operating procedure, etc.
Major Equipment
Field instruments (includes sensor/ transducers, transmitters, single loop controllers, Converters, control valve, etc.) for flow, level, pressure, temperature parameters. Test and calibration instruments at least for temperature and pressure parameters.
Other
http://vlab.co.in/
www.isa.org
http://nptel.ac.in/video.php
http://www.idc-online.com/